Welcome to Biomass Chemical Engineering,

›› 2007, Vol. 41 ›› Issue (4): 46-48.

• 技改园地 • Previous Articles     Next Articles

Discussion on Some Problems about Design of Production Line for Hydrogenatied Rosin

GAO Yi-wei1, KONG Lin-shen2, HUANG Bin2   

  1. 1. Institute of Chemical Industry of Forest Products, CAF;Key and Open Lab. on Forest Chemical Engineering, SFA, Nanjing 210042, China;2. Wuzhou Sun Shine Forestry & Chemicals Co. Ltd. of Guangxi, Wuzhou 543100, China
  • Received:2007-05-15 Revised:1900-01-01 Online:2007-07-30 Published:2007-07-30

Abstract: The problems, such as operation pressure, reactor design, selection of gas-liquid ratio, reaction heat control and calculation of hydrogen consumption etc. for designing of new production line with capacity of 5000 t/a hydrogenated rosin based on the enlargement and reconstruction of original production line in Gungxi Wuzhou Sun Shine Forestry & Chemical Co.Ltd. are discussed in this paper.

Key words: hydrogenation rosin, design on production line

CLC Number: